Notes:
1. Presentation(s)
Current version of the script line is in
This Google Doc. Please read it before the meeting. I expect Nick and Guru will drive discussion how we proceed here.
Open Items/Questions:
- Need to find time slot to talk about opening/closing
- How do we get from here (i.e. storyline) to slides
2. Aster*x
- Campus Infrastructure Update
- What is the status of NLR - do we know if we have switches?
- Do we have a (more or less) final topology?
- Review, campus status matrix
- Calling infrastructure
- Status: tested with about 20 at reatreat
- Decided to try and test with a large lecture audience (David, Scott). Has this happened?
- Trying to get good 1-800 number. In progress (Guido owns)
3. Wireless Demo
Update on Wireless:
- Wifi
- Done: 1st floor AP moved to have better coverage
- WiMax?
- Done: Masa working on firmware reflash
- Done: install antenna, amplifier
- Open: move base station
- Open: test coverage, testing expected Wed
- Laptop
- Open: Is bi/tri-casting driver from laptop ready?
- Open: Is it tested?
- Rutgers:
- Suggestion: Tie them in as a 15 second video
- Wired infrastructure: in progress (Srini)
- Wireless needs work
- Demo flow:
- We want to make a decision on video vs. live today: what is the status
- Need a decision what vehicle to use (motorcycle, bike etc.)
- Video
- If we go the video route, the idea is to collect data first and then animate it.
- Are we ready to film footage and collect the data? If not, what is missing?
4. Dry Runs
- When can we do complete dry run of both demos?
- What is still missing to do this?
Action Items:
- Find or rent golf cart from now until Nov 4th (Yiannis)
- Find out motorcycle feasability (Guido)
- 1-800 Number (Guido)
- Action Camera (TY)
- Surveillance Setup (TY)
- Goal: Fri 10:30 demo with (Guido: send reminder):
- colf cart
- camera pointing at wheel/speedometer
- WiFi?/WiMax
- Streaming Up
- Rutgers: Wireless infrastucture (Masa)
- Rutgers: Video idea, get buy in (Guido)
- NLR: Date for complete OF infrastructure (Srini)
- Indiana: Get missing topo information
- Announce topology freeze (Guido)
- Note to Johan: NLR topology (Srini)
- Ask hotel AT&T coverage in conference room (Guido)
- Pico Cell/Repeater for Omni Hotel (Guru)
--
GuidoAppenzeller - 12 Oct 2010